Owner Current Location Field Owner Operator Deadweight Storage Capacity Mooring System Production Capacity
Offloading |
100 % Fred.Olsen Production ASA Antan Field (OPL123) Nigeria Addax Petroleum Development (Nigeria) Ltd Fred.Olsen Marine Services AS 244’492 tonnes 1.7 million barrels Spread Mooring Oil 60’000 BOPD Total Liquid 140’000 BLPD Gas Handling 7 MMSCFPD Buoy and Tandem Offloading |
IMO No.: 8412974, Year of Build: 1985, Yard: Mitsubishi Heavy Industries Ltd.
Flag: Singapore, Classification: DnV History
Knock Adoon (built in 1985 at Mitsubishi Heavy Industries Japan) was converted from a trading tanker to an FPSO at Dubai Drydocks. FPSO Knock Adoon replaced FPSO Knock Taggart on the Antan Field, offshore Nigeria, in October 2006. Knock Adoon operates under an eight year contract with another eight one year options contract for Addax Petroleum.