Logo



Owner
Current Location
Field Owner
Operator
Deadweight
Storage Capacity
Mooring System
Production Capacity

Offloading
 
100 % Fred.Olsen Production ASA
Antan Field (OPL123) Nigeria 
Addax Petroleum Development (Nigeria) Ltd
Fred.Olsen Marine Services AS
244’492 tonnes
1.7 million barrels
Spread Mooring
Oil 60’000 BOPD
Total Liquid 140’000 BLPD
Gas Handling 7 MMSCFPD
Buoy and Tandem Offloading

 IMO No.:  8412974, Year of Build: 1985, Yard: Mitsubishi Heavy Industries Ltd.

Flag: Singapore, Classification: DnV

History
Knock Adoon (built in 1985 at Mitsubishi Heavy Industries Japan) was converted from a trading tanker to an FPSO at Dubai Drydocks. FPSO Knock Adoon replaced FPSO Knock Taggart on the Antan Field, offshore Nigeria, in October 2006. Knock Adoon operates under an eight year contract with another eight one year options contract for Addax Petroleum.